Future City Metro: In 40 minutes from Future City Airport, DPR Full-Metro MD by end of March

Future City Metro: In 40 minutes from Future City Airport, DPR Full-Metro MD by end of March

Future City Metro: The state government is advancing the development of future city as the fourth city in a series of Hyderabad, Secunderabad and Cybabad. CM Revent Reddy expected to join the wonderful cities of the world as pollution -Fri Green City. As part of it, the state government is planning a metro rail expansion plan with HMDA and TGIC at Hyderabad Airport.

CM Revent Reddy has ordered the development of green corridors to ensure that the future city should be developed from international airport to future city. Hyderabad Metro MD NVS NVS Reddy said that the Green Corridor will play a major role in the construction of a pollution -free city of four cities city, which will spread over fifteen thousand acres and provide international travel facilities. The Metro MD has made several suggestions on the survey work of the Metro Corridor DPR from the airport to Skill University, which is under construction in Mir Khan Pate. After crossing Kongra Kalan, a road shortage was now foot and crossed the hills and hills on foot.

The metro route from Shamshabad Airport to Future City is about 40 km, which starts from the terminal of the airport and from the airport boundary wall from the newly made Metro Rail Depot Side to Mansan Palli Road, which 5 from Munsan Palli 5 Km is away. Road or said for large Golconda. NVS Reddy said that two metro stations in Bahadur Guda and Big Golconda will be developed to develop about 1000 to 1500 acres of state land in Bahadur Guda as per the Chief Minister’s instructions.

22 km

He said that the metro route would be built at the lower height of the metro rail at the lower height of the metro rail, which comes out of the tukkugud exit, until the exit to get out of the large Golconda or out of the Golconda or. About 22 km from Skill University exiting Raviral, which is already under construction, Kongrakalan, Lemur, Thimpur, Rachalur, Gummadavalli, Panjaguda, Mir Khan Pate, 22 meters (72 feet) centers of Greenfield Road (72 feet) Has been allocated in ,

He said that the Metro Rail Corridor will be developed as ‘et grade metro’ in the middle of the road. He said that if there is a metro rail in the center of this huge road, there will be a three -lalane main road on both sides, which will divide the metro and the main road with attractive trees and greenery and two service roads. The main road will be established.

Metro, ORR is mocked that it is not possible

Recalling his previous experience, the Metro MD stated that YSR had agreed to allocate enough space to allocate enough space in the future as an integral part of ORR as the Chief Minister of YSR. He said that many schemes of ORR and Metro were limited to paper and they were mocked that they were not practical, but both Orr and Metro were in the office. Hyderabad has developed an international city and attracts the world’s leading companies and investments.

The Metro MD said that Hyderabad has a more bright future with large infrastructure projects of the present government. HMDA, TGIC and Metro Rail companies are working together to ensure that the first phase of the Metro has successfully completed the first phase of the metro with the PPP of Rs 22,000 crore with the vision of CM Retirement Reddy. Apart from Medchal and Sameer Pate Corridor in North City, Future City Metro Corridor DPR will be completed by the end of March and will present it to the Central Government with the approval of the state government.


Leave a Comment